Lombard Square, Plumstead

This major regeneration scheme delivers 1,913 new homes over approximately 47,000 sqm of residential, community and commercial spaces.

Delivered across three phases, Skyler has undertaken site-wide waterproofing works totalling approximately 22,000 sqm, supporting the phased evolution of the development and ensuring continuity of performance across multiple build stages.

Given the scale and complexity of the scheme, a multi-system approach was adopted to meet varying design, performance, and programme requirements. This included the installation of bituminous hot melt systems, built-up felt roofing, and cold applied waterproofing solutions, all integrated with non-combustible insulation to meet stringent fire safety and regulatory standards.

Roof finishes across the development incorporate a combination of blue and green roof systems, alongside paved and decked areas, delivering a balanced approach to sustainability, water management, and user access.

The result is a robust, high-performance waterproofing strategy that delivers a professional, future-proofed solution for this large-scale regeneration project.

Systems Used:

  • Aluminium Decking
  • Bituminous Systems
  • Decking
  • Finishes
  • Green Roofs
  • Hot Melt
  • Liquid Waterproofing
  • Paving
  • Rainwater Systems
  • XPS Insulation

Architect:

BDP / Bond Bryan

Size:

22,000 sqm

Year:

2026