Written by Mark Poole on . Posted in Uncategorised.
This new build scheme located directly on the Thames was a multi-phased project for Skyler, who provided over 5,000sqm of roofing and waterproofing systems.
The full array provided were: Hot Melt, XPS insulation, Single Ply, Three Layered Felt, Green Roofs, Cappings, Paving, Cold Applied Waterproofing, Fall Arrest.
Written by Mark Poole on . Posted in Uncategorised.
This scheme in the heart of Bermondsey offered accommodation and retail units.
The roofing and waterproofing comprised of over 4,000sqm of hot melt including complex paving finishes. This was the main part of the project for Skyler.
Separate systems used on the project for various areas throughout the scheme were: the 500sqm of three layer felt system with PIR Insulation and green roof.
Written by Mark Poole on . Posted in Uncategorised.
Skyler were principal contractor for these six residential blocks in West London.
The requirement was to renewal the waterproofing system to all roof areas and reinstate the existing finishes.
Logistics were extremely challenging as the development sat between two of London’s main train lines. Careful planning and execution of the works were completed without any incidents.
Chobham Manor is a major development set within picturesque park areas and adjacent to the Olympic Velodrome.
The project which consists of four phases, provides spacious and comfortable living. The setting provides a number of green areas which affords a sense of space and tranquillity.
The location setting allows easy access into the heart of London, with a time of 8 minutes via train from Stratford Station to Liverpool Street Station; for its residents, it provides all requirements.
For Skyler Contracting, it has been a project since 2017 and from phase 2 onwards, Skyler have provided the Cold Applied Waterproofing Systems throughout, along with all associated finishes including Green and Brown Roof, Man-Safe Systems as well as Paving finishes.
Skyler prides itself in being able to offer these services and to this scale; some 12,000sqm of waterproofing and finishes have already been completed and guaranteed.
A close working relationship with the exemplary site team has made the project really flourish.