Lords Cricket Ground

Skyler Contracting were approached Marylebone Cricket Club (MCC) to provide roofing refurbishment upgrades to multiple locations within Lords Cricket Grounds.

The existing roof areas were approaching end of life and required complete replacement, consisting of ripping up the old failing system & installation of new tapered insulation schemes.

 

Lombard Square, Plumstead

This large-scale redevelopment site comprises 1,913 new homes and 47,000 sqft of industrial, community, commercial and employment space with 1.8 acres of public park land.

Across 3 phases, Skyler has provided waterproofing works site-wide totalling approx. 22,000sqm.

The scale of the development required a multi-system approach comprising bituminous hot melt, built up felt and liquid waterproofing in conjunction with non-combustible insulation.

Finishes incorporate blue roof, green roof, paving and decking solutions throughout.

Coronation Square, Leyton

This multi-phased new build scheme in East London stretched over 6,000 sqm of roofing and waterproofing including the finishes.

The systems provided by Skyler were Hot Melt Waterproofing, three layer felt with insulation, Blue, Green & Brown Roofs, mansafe systems, Cold Applied Waterproofing, Metal sheet roofing, Aluminium Decking and Paving.

 

Good Luck Hope, London

This new build scheme located directly on the Thames was a multi-phased project for Skyler, who provided over 5,000sqm of roofing and waterproofing systems.

The full array provided were: Hot Melt, XPS insulation, Single Ply, Three Layered Felt, Green Roofs, Cappings, Paving, Cold Applied Waterproofing, Fall Arrest.

Dockley Road, Bermondsey

This scheme in the heart of Bermondsey offered accommodation and retail units.

The roofing and waterproofing comprised of over 4,000sqm of hot melt including complex paving finishes. This was the main part of the project for Skyler.

Separate systems used on the project for various areas throughout the scheme were: the 500sqm of three layer felt system with PIR Insulation and green roof.

Coronation Square, Leyton

This multi phased new build scheme in East London stretched over 6,000 sqm of roofing and waterproofing including the finishes.

The systems provided by Skyler were Hot Melt Waterproofing, three layer felt with insulation, Blue, Green & Brown Roofs, mansafe systems, Cold Applied Waterproofing, Metal sheet roofing, Aluminium Decking and Paving.

Joseph Lancaster Nursery

Skyler provided approximately 1,100 sqm of roofing systems for a new build development for Southwark Council.

These comprised of a Three Layered Felt System with PIR Insulation and Green Roof installation.

Haggerston School, Hackney

Skyler acted as principal contractor on this refurbishment for The London Borough of Hackney.

The requirement was for the full strip up and complete renewal of the existing roofing system.

The overall project spanned over 2,000sqm and consisted of a Three Layer Felt system with tapered insulation.

Aspyre, Chelmer Waterside

Phase two of this new build development consisted of three main roof areas totalling approximately 4,000 sqm.

A Three Layered Felt system with tapered insulation & Hot Melt waterproofing with paving to over 2,000 sqm was used.

Canterbury Riverside, Kent

This vast new build scheme incorporating leisure, retail and accommodation was completed in 2022.

Approximately 3,500sqm of Three Layered Felt system with tapered insulation including Green Roofs.

2,000 sqm of hot melt waterproofing, 1,200 sqm of metal sheeting to the retail section of the development and a final 1000 sqm of complex sound deadening within the roof build up to the cinema building.