System Type: Fall Arrest System

Lords Cricket Ground

Skyler was appointed by the Marylebone Cricket Club (MCC) to deliver a comprehensive roofing refurbishment programme across multiple buildings within the prestigious Lord’s Cricket Ground estate.

With several roof areas reaching the end of their operational lifespan, the project required a full strip-out of the existing systems and the installation of high-performance replacement solutions.

Skyler implemented a built up felt and tapered insulation scheme design to improve drainage, enhance thermal efficiency, and extend long-term durability.

This programme not only addressed critical maintenance requirements but also delivered a future-proofed roofing solution aligned with the client’s performance and sustainability objectives.

Works were completed ensuring minimal disruption within a live, world-class sporting venue.

Monier Road, Hackney Wick

This new development in the heart of Hackney Wick consisted of 150 residential apartments and town houses, across two blocks.

The scope of works required included standing seam metal roofing with Rockwool insulation, bituminous hot melt with foam glass insulation and liquid waterproofing.

Roof finishes comprised of green and blue roof systems, paved areas, metal decking, metal parapet cappings, mansafe solutions and abseil points.

Coronation Square, Leyton

This multi-phased new build scheme in East London stretched over 6,000 sqm of roofing and waterproofing including the finishes.

The systems provided by Skyler were Hot Melt Waterproofing, three layer felt with insulation, Blue, Green & Brown Roofs, mansafe systems, Cold Applied Waterproofing, Metal sheet roofing, Aluminium Decking and Paving.

 

London City Island

This scheme comprised of waterproofing, blue roof installation and a complete rubber crumb sports pitch to approximately 1,800 sqm.

The main area above the car park was approximately 1,100 sqm. The waterproofing was a Hot Melt system with XPS Insulation.

The finishes were a blue roof attenuation system with a bespoke rubber crumb sports pitch including line marking which offers the residents of the development an extremely useful area for all year round use.

Good Luck Hope, London

This new build scheme located directly on the Thames was a multi-phased project for Skyler, who provided over 5,000sqm of roofing and waterproofing systems.

The full array provided were: Hot Melt, XPS insulation, Single Ply, Three Layered Felt, Green Roofs, Cappings, Paving, Cold Applied Waterproofing, Fall Arrest.

Coronation Square, Leyton

This multi phased new build scheme in East London stretched over 6,000 sqm of roofing and waterproofing including the finishes.

The systems provided by Skyler were Hot Melt Waterproofing, three layer felt with insulation, Blue, Green & Brown Roofs, mansafe systems, Cold Applied Waterproofing, Metal sheet roofing, Aluminium Decking and Paving.

West Hampstead Square

Skyler were principal contractor for these six residential blocks in West London.

The requirement was to renewal the waterproofing system to all roof areas and reinstate the existing finishes.

Logistics were extremely challenging as the development sat between two of London’s main train lines. Careful planning and execution of the works were completed without any incidents.

Canterbury Riverside, Kent

This vast new build scheme incorporating leisure, retail and accommodation was completed in 2022.

Approximately 3,500sqm of Three Layered Felt system with tapered insulation including Green Roofs.

2,000 sqm of hot melt waterproofing, 1,200 sqm of metal sheeting to the retail section of the development and a final 1000 sqm of complex sound deadening within the roof build up to the cinema building.

Chobham Manor

Chobham Manor is a major development set within picturesque park areas and adjacent to the Olympic Velodrome.

The project which consists of four phases, provides spacious and comfortable living. The setting provides a number of green areas which affords a sense of space and tranquillity.

The location setting allows easy access into the heart of London, with a time of 8 minutes via train from Stratford Station to Liverpool Street Station; for its residents, it provides all requirements.

For Skyler Contracting, it has been a project since 2017 and from phase 2 onwards, Skyler have provided the Cold Applied Waterproofing Systems throughout, along with all associated finishes including Green and Brown Roof, Man-Safe Systems as well as Paving finishes.

Skyler prides itself in being able to offer these services and to this scale; some 12,000sqm of waterproofing and finishes have already been completed and guaranteed.

A close working relationship with the exemplary site team has made the project really flourish.

Arisdale Avenue

St Modwen Homes development in South Ockenden spans over a 10 acre site giving a wide range of 1-4 bedroom homes.

Set adjacent to a new public park, it provides open and well-lit pedestrian areas. An easy commute to Central London within 30 minutes provides, its residents ease and convenience.

Skyler Contracting undertook all of the flat roofing installs to blocks A-C providing a total of 1,500sqm of fully insulated felt systems.

Alongside the Roofing System, Skyler installed all of the Perimeter Cappings, Paving, Ballast and Man-Safe Systems to each block.

An excellent working relationship with St Modwen Homes on site, enabled Skyler to progress through these works in good time.