System Type: Blue Roofs

Monier Road, Hackney Wick

This residential development in Hackney Wick comprises 150 apartments and townhouses across two blocks, requiring a technically diverse and high-performance roofing solution.

Skyler delivered a multi-system package including standing seam metal roofing with Rockwool insulation, bituminous hot melt with foam glass insulation, and liquid waterproofing to address complex detailing.

Roof finishes incorporated green and blue roof systems to support sustainable drainage and biodiversity, alongside paved areas with ballast and bespoke perimeter cappings.

The package was further complemented by modern metal decking on balconies and terraces.

Fully integrated mansafe systems and abseil points ensured safe long-term maintenance.

The result is a durable, compliant, and future-proof roofing solution aligned with modern residential performance and sustainability standards.

Polymex House, Peckham

This new-build development, constructed on the former site of the historic R. White’s Lemonade and Edison Bell factory, delivered a mixed-use scheme comprising 170 residential units and ground-floor retail space. The project included approximately 3,300 sqm of waterproofing works and associated roof finishes.

Skyler delivered a comprehensive roofing and waterproofing package, with bituminous hot melt systems and XPS insulation utilised extensively across the development. This combination provided a durable, high-performance solution offering excellent thermal efficiency and long-term waterproofing integrity.

Blue roof zones were integrated with green roof systems across the development to combine enhanced drainage control and ecological benefits.

Paved finishes were installed across selected roof areas, balconies, and terraces, creating functional and aesthetically consistent external spaces while ensuring protection of the underlying systems.

 

 

Coronation Square, Leyton

This impressive, multi-phased, new-build scheme in East London comprised over 6,000 sqm of waterproofing works delivered across a complex programme of development.

Skyler delivered a fully integrated waterproofing strategy designed to meet the varied technical demands of the scheme while maintaining consistency in performance and quality across all phases.

The package included hot melt waterproofing with XPS insulation, built-up felt systems with integrated PIR insulation, standing seam metal roofing and cold-applied liquid waterproofing solutions, each selected to suit specific roof zones, detailing requirements, and programme constraints.

A key element of the development was the incorporation of blue, green, and brown roof zones, forming a comprehensive sustainable drainage and environmental strategy. These systems were designed to manage surface water runoff effectively, reduce pressure on drainage infrastructure, and enhance biodiversity through varied substrate and planting approaches. Collectively, they also contribute to improved thermal performance and long-term ecological value across the site.

The programme also incorporated a range of additional finishing elements including aluminium decking, and paved roof areas.

To support safe long-term access and compliance, mansafe systems were installed across all principal roof areas, ensuring secure maintenance routes and reducing operational risk for the facilities teams.

London City Island

This scheme comprised of waterproofing, blue roof installation and a complete rubber crumb sports pitch to approximately 1,800 sqm.

The main area above the car park was approximately 1,100 sqm. The waterproofing was a Hot Melt system with XPS Insulation.

The finishes were a blue roof attenuation system with a bespoke rubber crumb sports pitch including line marking which offers the residents of the development an extremely useful area for all year round use.

London South Bank University

The university required a full roofing upgrade to replace an outdated system that no longer met performance or thermal efficiency standards. Skyler was appointed to deliver a comprehensive solution designed to enhance durability, energy efficiency, and long-term asset value.

Our team successfully removed over 4,500 sqm of the existing roof. The new installation incorporated a high-performance Hot Melt Waterproofing system combined with XPS insulation.

To further optimise water management and sustainability, a bespoke Blue Roof attenuation system was integrated, effectively controlling rainwater runoff and supporting drainage efficiency.

In addition, approximately 900 sqm of Three-Layer Felt roofing with PIR insulation was installed, ensuring consistent performance across varied roof areas.

The project was completed with high-quality ballast and paving finishes.

Company Number: 08686732 | Registered in England & Wales