System Type: Brown Roofs

Plimsoll Building, Kings Cross

Skyler Contracting was appointed to deliver a full waterproofing replacement across balconies, terraces, and roof areas within this prestigious King’s Cross development.

The existing failing hot melt system was fully removed and replaced with a flameless, cold-applied liquid waterproofing solution—specifically selected to meet strict fire safety requirements and enable works to be carried out safely within an occupied residential environment.

Additional enhancements included the installation of brown roof systems to support biodiversity, alongside upgrades to rainwater management to improve overall drainage performance.

The result is a safe, compliant, and long-lasting waterproofing solution that minimised disruption while rectifying ongoing issues with deficiencies in the original waterproofing system.

Delivered within a live residential setting, the project demonstrates Skyler’s ability to provide safe, compliant, and future-proofed solutions, combining technical expertise with a strong focus on resident safety and asset longevity for the client.

 

Coronation Square, Leyton

This impressive, multi-phased, new-build scheme in East London comprised over 6,000 sqm of waterproofing works delivered across a complex programme of development.

Skyler delivered a fully integrated waterproofing strategy designed to meet the varied technical demands of the scheme while maintaining consistency in performance and quality across all phases.

The package included hot melt waterproofing with XPS insulation, built-up felt systems with integrated PIR insulation, standing seam metal roofing and cold-applied liquid waterproofing solutions, each selected to suit specific roof zones, detailing requirements, and programme constraints.

A key element of the development was the incorporation of blue, green, and brown roof zones, forming a comprehensive sustainable drainage and environmental strategy. These systems were designed to manage surface water runoff effectively, reduce pressure on drainage infrastructure, and enhance biodiversity through varied substrate and planting approaches. Collectively, they also contribute to improved thermal performance and long-term ecological value across the site.

The programme also incorporated a range of additional finishing elements including aluminium decking, and paved roof areas.

To support safe long-term access and compliance, mansafe systems were installed across all principal roof areas, ensuring secure maintenance routes and reducing operational risk for the facilities teams.

West Hampstead Square

Skyler were principal contractor for these six residential blocks in West London.

The requirement was to renewal the waterproofing system to all roof areas and reinstate the existing finishes.

Logistics were extremely challenging as the development sat between two of London’s main train lines. Careful planning and execution of the works were completed without any incidents.

Canterbury Riverside, Kent

This vast new build scheme incorporating leisure, retail and accommodation was completed in 2022.

Approximately 3,500sqm of Three Layered Felt system with tapered insulation including Green Roofs.

2,000 sqm of hot melt waterproofing, 1,200 sqm of metal sheeting to the retail section of the development and a final 1000 sqm of complex sound deadening within the roof build up to the cinema building.

Chobham Manor

Chobham Manor is a major development set within picturesque park areas and adjacent to the Olympic Velodrome.

The project which consists of four phases, provides spacious and comfortable living. The setting provides a number of green areas which affords a sense of space and tranquillity.

The location setting allows easy access into the heart of London, with a time of 8 minutes via train from Stratford Station to Liverpool Street Station; for its residents, it provides all requirements.

For Skyler Contracting, it has been a project since 2017 and from phase 2 onwards, Skyler have provided the Cold Applied Waterproofing Systems throughout, along with all associated finishes including Green and Brown Roof, Man-Safe Systems as well as Paving finishes.

Skyler prides itself in being able to offer these services and to this scale; some 12,000sqm of waterproofing and finishes have already been completed and guaranteed.

A close working relationship with the exemplary site team has made the project really flourish.