System Type: Metal Cappings

Coronation Square

This multi-phased new build scheme in East London stretched over 6,000 sqm of roofing and waterproofing including the finishes.

The systems provided by Skyler were Hot Melt Waterproofing, three layer felt with insulation, Blue, Green & Brown Roofs, mansafe systems, Cold Applied Waterproofing, Metal sheet roofing, Aluminium Decking and Paving.

 

London City Island

This scheme comprised of waterproofing, blue roof installation and a complete rubber crumb sports pitch to approximately 1,800 sqm.

The main area above the car park was approximately 1,100 sqm. The waterproofing was a Hot Melt system with XPS Insulation.

The finishes were a blue roof attenuation system with a bespoke rubber crumb sports pitch including line marking which offers the residents of the development an extremely useful area for all year round use.

Good Luck Hope, London

This new build scheme located directly on the Thames was a multi-phased project for Skyler, who provided over 5,000sqm of roofing and waterproofing systems.

The full array provided were: Hot Melt, XPS insulation, Single Ply, Three Layered Felt, Green Roofs, Cappings, Paving, Cold Applied Waterproofing, Fall Arrest.

Coronation Square, Leyton

This multi phased new build scheme in East London stretched over 6,000 sqm of roofing and waterproofing including the finishes.

The systems provided by Skyler were Hot Melt Waterproofing, three layer felt with insulation, Blue, Green & Brown Roofs, mansafe systems, Cold Applied Waterproofing, Metal sheet roofing, Aluminium Decking and Paving.

Canterbury Riverside, Kent

This vast new build scheme incorporating leisure, retail and accommodation was completed in 2022.

Approximately 3,500sqm of Three Layered Felt system with tapered insulation including Green Roofs.

2,000 sqm of hot melt waterproofing, 1,200 sqm of metal sheeting to the retail section of the development and a final 1000 sqm of complex sound deadening within the roof build up to the cinema building.

Beulah Hill, Croydon

The roof and balcony waterproofing systems covered approximately 1900sqm.

There was a combination of Hot Melt waterproofing, a warm roof system and cold applied waterproofing across the project.

Alongside the roofing and balcony waterproofing systems, a further 400 linear metres of metal cappings were installed.

Harris Academy

Skyler Contracting were chosen as Principal Contractor for the roof refurbishment at Harris Academy in Bermondsey.

The main roof areas were in an extremely poor state and had a number of attempts to stop the leaks over a number of years but to no avail.

Skyler Contracting assembled a full scaffold that totalled twelve storeys to gain independent access to the roof areas.

Works consisted of complete removal of the existing Mastic Asphalt which had failed in many places. Underneath of the Asphalt was a degraded screed that was also removed. This fell outside the original specification and was an addition.

Combining this addition, whilst working in a live school with exams underway, made this an extremely sensitive project. Constant communication with the school hierarchy and detailed schedules as to when each element of works was taking place, became a critical factor in delivering this project to the trust in the defined timeframe.

The project area in total was 500sqm.

Company Number: 08686732 | Registered in England & Wales