The university required a full roofing upgrade to replace an outdated system that no longer met performance or thermal efficiency standards. Skyler was appointed to deliver a comprehensive solution designed to enhance durability, energy efficiency, and long-term asset value.
Our team successfully removed over 4,500 sqm of the existing roof. The new installation incorporated a high-performance Hot Melt Waterproofing system combined with XPS insulation.
To further optimise water management and sustainability, a bespoke Blue Roof attenuation system was integrated, effectively controlling rainwater runoff and supporting drainage efficiency.
In addition, approximately 900 sqm of Three-Layer Felt roofing with PIR insulation was installed, ensuring consistent performance across varied roof areas.
The project was completed with high-quality ballast and paving finishes.
Skyler Contracting were tasked as Principal Contractor for the refurbishment to a number of roof areas at Meridian High School.
The existing roof areas had passed their serviceable life and were in need for thermal upgrades alongside a new waterproofing system.
In addition, all soffit, fascia and rainwater goods would also be upgraded to powder coated metal by Skyler Contracting.
Skyler Contracting worked diligently throughout the project, which consisted of over 3,000 sqm and delivered the trust all the requirements the project needed.