Coronation Square, Leyton
This impressive, multi-phased, new-build scheme in East London comprised over 6,000 sqm of waterproofing works delivered across a complex programme of development.
Skyler delivered a fully integrated waterproofing strategy designed to meet the varied technical demands of the scheme while maintaining consistency in performance and quality across all phases.
The package included hot melt waterproofing with XPS insulation, built-up felt systems with integrated PIR insulation, standing seam metal roofing and cold-applied liquid waterproofing solutions, each selected to suit specific roof zones, detailing requirements, and programme constraints.
A key element of the development was the incorporation of blue, green, and brown roof zones, forming a comprehensive sustainable drainage and environmental strategy. These systems were designed to manage surface water runoff effectively, reduce pressure on drainage infrastructure, and enhance biodiversity through varied substrate and planting approaches. Collectively, they also contribute to improved thermal performance and long-term ecological value across the site.
The programme also incorporated a range of additional finishing elements including aluminium decking, and paved roof areas.
To support safe long-term access and compliance, mansafe systems were installed across all principal roof areas, ensuring secure maintenance routes and reducing operational risk for the facilities teams.
