Coronation Square

This multi-phased new build scheme in East London stretched over 6,000 sqm of roofing and waterproofing including the finishes.

The systems provided by Skyler were Hot Melt Waterproofing, three layer felt with insulation, Blue, Green & Brown Roofs, mansafe systems, Cold Applied Waterproofing, Metal sheet roofing, Aluminium Decking and Paving.

 

London City Island

This scheme comprised of waterproofing, blue roof installation and a complete rubber crumb sports pitch to approximately 1,800 sqm.

The main area above the car park was approximately 1,100 sqm. The waterproofing was a Hot Melt system with XPS Insulation.

The finishes were a blue roof attenuation system with a bespoke rubber crumb sports pitch including line marking which offers the residents of the development an extremely useful area for all year round use.

Good Luck Hope, London

This new build scheme located directly on the Thames was a multi-phased project for Skyler, who provided over 5,000sqm of roofing and waterproofing systems.

The full array provided were: Hot Melt, XPS insulation, Single Ply, Three Layered Felt, Green Roofs, Cappings, Paving, Cold Applied Waterproofing, Fall Arrest.

Dockley Road, Bermondsey

This scheme in the heart of Bermondsey offered accommodation and retail units.

The roofing and waterproofing comprised of over 4,000sqm of hot melt including complex paving finishes. This was the main part of the project for Skyler.

Separate systems used on the project for various areas throughout the scheme were: the 500sqm of three layer felt system with PIR Insulation and green roof.

Coronation Square, Leyton

This multi phased new build scheme in East London stretched over 6,000 sqm of roofing and waterproofing including the finishes.

The systems provided by Skyler were Hot Melt Waterproofing, three layer felt with insulation, Blue, Green & Brown Roofs, mansafe systems, Cold Applied Waterproofing, Metal sheet roofing, Aluminium Decking and Paving.

Joseph Lancaster Nursery

Skyler provided approximately 1,100 sqm of roofing systems for a new build development for Southwark Council.

These comprised of a Three Layered Felt System with PIR Insulation and Green Roof installation.

Canterbury Riverside, Kent

This vast new build scheme incorporating leisure, retail and accommodation was completed in 2022.

Approximately 3,500sqm of Three Layered Felt system with tapered insulation including Green Roofs.

2,000 sqm of hot melt waterproofing, 1,200 sqm of metal sheeting to the retail section of the development and a final 1000 sqm of complex sound deadening within the roof build up to the cinema building.

Chobham Manor

Chobham Manor is a major development set within picturesque park areas and adjacent to the Olympic Velodrome.

The project which consists of four phases, provides spacious and comfortable living. The setting provides a number of green areas which affords a sense of space and tranquillity.

The location setting allows easy access into the heart of London, with a time of 8 minutes via train from Stratford Station to Liverpool Street Station; for its residents, it provides all requirements.

For Skyler Contracting, it has been a project since 2017 and from phase 2 onwards, Skyler have provided the Cold Applied Waterproofing Systems throughout, along with all associated finishes including Green and Brown Roof, Man-Safe Systems as well as Paving finishes.

Skyler prides itself in being able to offer these services and to this scale; some 12,000sqm of waterproofing and finishes have already been completed and guaranteed.