System Type: Handrail & Mansafe

Central Criminal Courts

A comprehensive roof refurbishment project was successfully delivered at the Central Criminal Court in London, encompassing approximately 1,700 sqm of critical roof area within one of the UK’s most high-profile and operationally sensitive judicial buildings.

The existing asphalt roofing system, which had reached the end of its serviceable life, was fully removed and replaced with a high-performance tapered warm roof solution. This modern system was specifically designed to significantly enhance drainage efficiency, eliminating standing water risks, while also delivering substantial improvements in thermal performance.

To provide long-term assurance and added value, the works were completed with a comprehensive 20-year warranty.

Given the building’s importance and continuous use, the project was carefully planned and executed to minimise disruption, ensuring seamless coordination with on-site operations and strict adherence to health, safety, and security protocols.

London City Island

This scheme comprised of waterproofing, blue roof installation and a complete rubber crumb sports pitch to approximately 1,800 sqm.

The main area above the car park was approximately 1,100 sqm. The waterproofing was a Hot Melt system with XPS Insulation.

The finishes were a blue roof attenuation system with a bespoke rubber crumb sports pitch including line marking which offers the residents of the development an extremely useful area for all year round use.

West Hampstead Square

Skyler were principal contractor for these six residential blocks in West London.

The requirement was to renewal the waterproofing system to all roof areas and reinstate the existing finishes.

Logistics were extremely challenging as the development sat between two of London’s main train lines. Careful planning and execution of the works were completed without any incidents.

Haggerston School, Hackney

Skyler acted as principal contractor on this refurbishment for The London Borough of Hackney.

The requirement was for the full strip up and complete renewal of the existing roofing system.

The overall project spanned over 2,000sqm and consisted of a Three Layer Felt system with tapered insulation.

Canterbury Riverside, Kent

This vast new build scheme incorporating leisure, retail and accommodation was completed in 2022.

Approximately 3,500sqm of Three Layered Felt system with tapered insulation including Green Roofs.

2,000 sqm of hot melt waterproofing, 1,200 sqm of metal sheeting to the retail section of the development and a final 1000 sqm of complex sound deadening within the roof build up to the cinema building.

Company Number: 08686732 | Registered in England & Wales