Written by Mark Poole on . Posted in Uncategorised.
This new build scheme located directly on the Thames was a multi-phased project for Skyler, who provided over 5,000sqm of roofing and waterproofing systems.
The full array provided were: Hot Melt, XPS insulation, Single Ply, Three Layered Felt, Green Roofs, Cappings, Paving, Cold Applied Waterproofing, Fall Arrest.
Written by Mark Poole on . Posted in Uncategorised.
This scheme in the heart of Bermondsey offered accommodation and retail units.
The roofing and waterproofing comprised of over 4,000sqm of hot melt including complex paving finishes. This was the main part of the project for Skyler.
Separate systems used on the project for various areas throughout the scheme were: the 500sqm of three layer felt system with PIR Insulation and green roof.
Written by Mark Poole on . Posted in Uncategorised.
The university required a full roofing upgrade to replace an outdated system that no longer met performance or thermal efficiency standards. Skyler was appointed to deliver a comprehensive solution designed to enhance durability, energy efficiency, and long-term asset value.
Our team successfully removed over 4,500 sqm of the existing roof. The new installation incorporated a high-performance Hot Melt Waterproofing system combined with XPS insulation.
To further optimise water management and sustainability, a bespoke Blue Roof attenuation system was integrated, effectively controlling rainwater runoff and supporting drainage efficiency.
In addition, approximately 900 sqm of Three-Layer Felt roofing with PIR insulation was installed, ensuring consistent performance across varied roof areas.
The project was completed with high-quality ballast and paving finishes.
Written by Mark Poole on . Posted in Uncategorised.
Skyler were principal contractor for these six residential blocks in West London.
The requirement was to renewal the waterproofing system to all roof areas and reinstate the existing finishes.
Logistics were extremely challenging as the development sat between two of London’s main train lines. Careful planning and execution of the works were completed without any incidents.
Written by Mark Poole on . Posted in Uncategorised.
This vast new build scheme incorporating leisure, retail and accommodation was completed in 2022.
Approximately 3,500sqm of Three Layered Felt system with tapered insulation including Green Roofs.
2,000 sqm of hot melt waterproofing, 1,200 sqm of metal sheeting to the retail section of the development and a final 1000 sqm of complex sound deadening within the roof build up to the cinema building.