System Type: Finishes

Central Criminal Courts

A comprehensive roof refurbishment project at the Central Criminal Court, London covering approximately 1,700 sqm.

The removal of the existing asphalt system and installation of a tapered warm roof solution provided significant upgrades in drainage performance and thermal efficiency, ensuring full compliance with current regulations.

The works were delivered with a new and comprehensive 20-year warranty.

 

Milne Avenue, Cambridge

This build-to-rent residential development in Cambridge comprised of 373 new homes and consisted of 5,500sqm of waterproofing, insulation and multiple roof finishes.

A hot melt system was used extensively across the entire development including XPS insulation and a ballast finish. Separate areas required the installation of a green roof system with paving walkways and mansafe fall prevention.

 

 

Monier Road, Hackney Wick

This new development in the heart of Hackney Wick consisted of 150 residential units, including town houses, across two blocks.

The scope of works required included standing seam metal roofing with Rockwool insulation, bituminous hot melt with foam glass insulation and liquid waterproofing.

Roof finishes comprised of green and blue roof systems, paved areas, metal decking, metal parapet cappings, mansafe solutions and abseil points.

Plimsoll Building, Kings Cross

Skyler were contracted to remove and replace the existing failing waterproofing across all balconies, terraces and roof areas within this prestigious Kings Cross development.

The existing hot melt required complete removal and replacement with a flameless, cold applied liquid waterproofing system due to safety restraints and occupied residential units.

Brown roof areas were installed and rainwater management systems upgraded.

 

 

 

Polymex House, Peckham

This new build development, built on the former site of the R. White’s Lemonade and Edison Bell radio factory, comprised of 3,300 sqm of waterproofing works and finishes across 170 residential units and mixed retail space.

Bituminous hot melt waterproofing and XPS insulation was utilised extensively across the development with paving finishes on all roof areas, balconies and terraces.

 

 

Lombard Square, Plumstead

This large-scale redevelopment site comprises 1,913 new homes and 47,000 sqft of industrial, community, commercial and employment space with 1.8 acres of public park land.

Across 3 phases, Skyler has provided waterproofing works site-wide totalling approx. 22,000sqm.

The scale of the development required a multi-system approach comprising bituminous hot melt, built up felt and liquid waterproofing in conjunction with non-combustible insulation.

Finishes incorporate blue roof, green roof, paving and decking solutions throughout.

Rennie Estate, Bermondsey

This 12 storey residential development required a built up felt system to the main roof and terraces, with a cold applied liquid waterproofing system to the private balconies.

Green roof and ballast finishes were installed on the two main roof areas alongside a mansafe system.

Coronation Square, Leyton

This multi-phased new build scheme in East London stretched over 6,000 sqm of roofing and waterproofing including the finishes.

The systems provided by Skyler were Hot Melt Waterproofing, three layer felt with insulation, Blue, Green & Brown Roofs, mansafe systems, Cold Applied Waterproofing, Metal sheet roofing, Aluminium Decking and Paving.

 

London City Island

This scheme comprised of waterproofing, blue roof installation and a complete rubber crumb sports pitch to approximately 1,800 sqm.

The main area above the car park was approximately 1,100 sqm. The waterproofing was a Hot Melt system with XPS Insulation.

The finishes were a blue roof attenuation system with a bespoke rubber crumb sports pitch including line marking which offers the residents of the development an extremely useful area for all year round use.

Good Luck Hope, London

This new build scheme located directly on the Thames was a multi-phased project for Skyler, who provided over 5,000sqm of roofing and waterproofing systems.

The full array provided were: Hot Melt, XPS insulation, Single Ply, Three Layered Felt, Green Roofs, Cappings, Paving, Cold Applied Waterproofing, Fall Arrest.

Company Number: 08686732 | Registered in England & Wales