Chobham Manor is a major development set within picturesque park areas and adjacent to the Olympic Velodrome.
The project which consists of four phases, provides spacious and comfortable living. The setting provides a number of green areas which affords a sense of space and tranquillity.
The location setting allows easy access into the heart of London, with a time of 8 minutes via train from Stratford Station to Liverpool Street Station; for its residents, it provides all requirements.
For Skyler Contracting, it has been a project since 2017 and from phase 2 onwards, Skyler have provided the Cold Applied Waterproofing Systems throughout, along with all associated finishes including Green and Brown Roof, Man-Safe Systems as well as Paving finishes.
Skyler prides itself in being able to offer these services and to this scale; some 12,000sqm of waterproofing and finishes have already been completed and guaranteed.
A close working relationship with the exemplary site team has made the project really flourish.
The development for L&Q at Master Gunners Phase 2 is set off of the main road and sheltered by a green belt of mature trees.
Its design comprises of a number of Mews style houses and south facing apartments.
Varying in design and materials, it provides aesthetically pleasing details combined with resident benefits such as well spaced Parallel streets and in-curtilage parking.
Skyler Contracting undertook the roofing package of around 2,000 sqm and comprising of:
Single Ply Roofing System incl Tapered Insulation, Man-Safe Systems, Cold Applied Waterproofing to Walkways and Balconies.
Also, all Pitched Roofing to the development was undertaken by Skyler Contracting.
This project allowed Skyler to showcase its capabilities as a multi-disciplined contractor.