System Type: Hot Melt

Rome House, Ealing

A new build scheme in West London consisted of 2,100 sqm of waterproofing and insulation.

The main roofs were Hot Melt with XPS Insulation.

The balconies across the project were completed in a Three Layer Felt system including non-combustible insulation.

Perrymount Apartments

A new build scheme in Sussex consisted of 2,200 sqm of waterproofing and insulation.

The main roofs were Hot Melt with XPS Insulation, the balconies across the project were completed in a specified two-layer system.

Aspyre, Chelmer Waterside

Phase two of this new build development consisted of three main roof areas totalling approximately 4,000 sqm.

A Three Layered Felt system with tapered insulation & Hot Melt waterproofing with paving to over 2,000 sqm was used.

Canterbury Riverside, Kent

This vast new build scheme incorporating leisure, retail and accommodation was completed in 2022.

Approximately 3,500sqm of Three Layered Felt system with tapered insulation including Green Roofs.

2,000 sqm of hot melt waterproofing, 1,200 sqm of metal sheeting to the retail section of the development and a final 1000 sqm of complex sound deadening within the roof build up to the cinema building.

Beulah Hill, Croydon

The roof and balcony waterproofing systems covered approximately 1900sqm.

There was a combination of Hot Melt waterproofing, a warm roof system and cold applied waterproofing across the project.

Alongside the roofing and balcony waterproofing systems, a further 400 linear metres of metal cappings were installed.

  • 1
  • 2
Company Number: 08686732 | Registered in England & Wales