This multi-phased new build scheme in East London stretched over 6,000 sqm of roofing and waterproofing including the finishes.

The systems provided by Skyler were Hot Melt Waterproofing, three layer felt with insulation, Blue, Green & Brown Roofs, mansafe systems, Cold Applied Waterproofing, Metal sheet roofing, Aluminium Decking and Paving.

 

London City Island

This scheme comprised of waterproofing, blue roof installation and a complete rubber crumb sports pitch to approximately 1,800 sqm.

The main area above the car park was approximately 1,100 sqm. The waterproofing was a Hot Melt system with XPS Insulation.

The finishes were a blue roof attenuation system with a bespoke rubber crumb sports pitch including line marking which offers the residents of the development an extremely useful area for all year round use.

Good Luck Hope, London

This new build scheme located directly on the Thames was a multi-phased project for Skyler, who provided over 5,000sqm of roofing and waterproofing systems.

The full array provided were: Hot Melt, XPS insulation, Single Ply, Three Layered Felt, Green Roofs, Cappings, Paving, Cold Applied Waterproofing, Fall Arrest.

Dockley Road, Bermondsey

This scheme in the heart of Bermondsey offered accommodation and retail units.

The roofing and waterproofing comprised of over 4,000sqm of hot melt including complex paving finishes. This was the main part of the project for Skyler.

Separate systems used on the project for various areas throughout the scheme were: the 500sqm of three layer felt system with PIR Insulation and green roof.

Coronation Square, Leyton

This multi phased new build scheme in East London stretched over 6,000 sqm of roofing and waterproofing including the finishes.

The systems provided by Skyler were Hot Melt Waterproofing, three layer felt with insulation, Blue, Green & Brown Roofs, mansafe systems, Cold Applied Waterproofing, Metal sheet roofing, Aluminium Decking and Paving.

London South Bank University

The university was in desperate need to replace the existing roofing system, which was an antiquated system, not fit for purpose and lacking the thermal efficiency required.

Skyler were tasked with removing over 4,500 sqm of existing roof system and providing the adequate temporary waterproofing whilst our full works were installed. Hot Melt Waterproofing and XPS to the vast majority of the area combined with a bespoke Blue Roof Attenuation system aiding the drainage run off.

There were also approx 900 sqm of Three Layer Felt systems with PIR Insulation.

A ballast and paving completed the finishes.

Rome House, Ealing

A new build scheme in West London consisted of 2,100 sqm of waterproofing and insulation.

The main roofs were Hot Melt with XPS Insulation.

The balconies across the project were completed in a Three Layer Felt system including non-combustible insulation.

Perrymount Apartments

A new build scheme in Sussex consisted of 2,200 sqm of waterproofing and insulation.

The main roofs were Hot Melt with XPS Insulation, the balconies across the project were completed in a specified two-layer system.

Aspyre, Chelmer Waterside

Phase two of this new build development consisted of three main roof areas totalling approximately 4,000 sqm.

A Three Layered Felt system with tapered insulation & Hot Melt waterproofing with paving to over 2,000 sqm was used.

Canterbury Riverside, Kent

This vast new build scheme incorporating leisure, retail and accommodation was completed in 2022.

Approximately 3,500sqm of Three Layered Felt system with tapered insulation including Green Roofs.

2,000 sqm of hot melt waterproofing, 1,200 sqm of metal sheeting to the retail section of the development and a final 1000 sqm of complex sound deadening within the roof build up to the cinema building.