System Type: XPS Insulation

Coronation Square

This multi-phased new build scheme in East London stretched over 6,000 sqm of roofing and waterproofing including the finishes.

The systems provided by Skyler were Hot Melt Waterproofing, three layer felt with insulation, Blue, Green & Brown Roofs, mansafe systems, Cold Applied Waterproofing, Metal sheet roofing, Aluminium Decking and Paving.

 

London City Island

This scheme comprised of waterproofing, blue roof installation and a complete rubber crumb sports pitch to approximately 1,800 sqm.

The main area above the car park was approximately 1,100 sqm. The waterproofing was a Hot Melt system with XPS Insulation.

The finishes were a blue roof attenuation system with a bespoke rubber crumb sports pitch including line marking which offers the residents of the development an extremely useful area for all year round use.

Good Luck Hope, London

This new build scheme located directly on the Thames was a multi-phased project for Skyler, who provided over 5,000sqm of roofing and waterproofing systems.

The full array provided were: Hot Melt, XPS insulation, Single Ply, Three Layered Felt, Green Roofs, Cappings, Paving, Cold Applied Waterproofing, Fall Arrest.

Coronation Square, Leyton

This multi phased new build scheme in East London stretched over 6,000 sqm of roofing and waterproofing including the finishes.

The systems provided by Skyler were Hot Melt Waterproofing, three layer felt with insulation, Blue, Green & Brown Roofs, mansafe systems, Cold Applied Waterproofing, Metal sheet roofing, Aluminium Decking and Paving.

London South Bank University

The university was in desperate need to replace the existing roofing system, which was an antiquated system, not fit for purpose and lacking the thermal efficiency required.

Skyler were tasked with removing over 4,500 sqm of existing roof system and providing the adequate temporary waterproofing whilst our full works were installed. Hot Melt Waterproofing and XPS to the vast majority of the area combined with a bespoke Blue Roof Attenuation system aiding the drainage run off.

There were also approx 900 sqm of Three Layer Felt systems with PIR Insulation.

A ballast and paving completed the finishes.

West Hampstead Square

Skyler were principal contractor for these six residential blocks in West London.

The requirement was to renewal the waterproofing system to all roof areas and reinstate the existing finishes.

Logistics were extremely challenging as the development sat between two of London’s main train lines. Careful planning and execution of the works were completed without any incidents.

Rome House, Ealing

A new build scheme in West London consisted of 2,100 sqm of waterproofing and insulation.

The main roofs were Hot Melt with XPS Insulation.

The balconies across the project were completed in a Three Layer Felt system including non-combustible insulation.

Perrymount Apartments

A new build scheme in Sussex consisted of 2,200 sqm of waterproofing and insulation.

The main roofs were Hot Melt with XPS Insulation, the balconies across the project were completed in a specified two-layer system.

Beulah Hill, Croydon

The roof and balcony waterproofing systems covered approximately 1900sqm.

There was a combination of Hot Melt waterproofing, a warm roof system and cold applied waterproofing across the project.

Alongside the roofing and balcony waterproofing systems, a further 400 linear metres of metal cappings were installed.

Chobham Manor

Chobham Manor is a major development set within picturesque park areas and adjacent to the Olympic Velodrome.

The project which consists of four phases, provides spacious and comfortable living. The setting provides a number of green areas which affords a sense of space and tranquillity.

The location setting allows easy access into the heart of London, with a time of 8 minutes via train from Stratford Station to Liverpool Street Station; for its residents, it provides all requirements.

For Skyler Contracting, it has been a project since 2017 and from phase 2 onwards, Skyler have provided the Cold Applied Waterproofing Systems throughout, along with all associated finishes including Green and Brown Roof, Man-Safe Systems as well as Paving finishes.

Skyler prides itself in being able to offer these services and to this scale; some 12,000sqm of waterproofing and finishes have already been completed and guaranteed.

A close working relationship with the exemplary site team has made the project really flourish.

Company Number: 08686732 | Registered in England & Wales